This civil engineering checklist about Masonry brick work helps ensure good quality of brickwork with economy and safety.
#civilengineering #checklist #masonrybrickwork
Sr | Check Item | Done |
1 | Availability of material as per daily requirement & test reports. | |
2 | Cleaning work area off loose material/concrete. | |
3 | Proper stacking of bricks/blocks. | |
4 | Quality of bricks/sand, tests performed and ok? | |
5 | Wetting of bricks. | |
6 | Door frames, if any, erected in position. | |
7 | Line out rechecked? (Room dimension, diagonals, alignment with one layer of brick work, Door opening position and verticality etc. | |
8 | Check mortar preparation and provision of platform. | |
9 | Check mortar thickness. | |
10 | Check plumb. | |
11 | Check finished level / Right angle/ Porportion of mix. | |
12 | Check hacking / conduit/ silt content in sand. | |
13 | Cleaning of dead mortar done. | |
14 | Curing and raking completed. | |
15 | Provision of patti done. | |
16 | Any additions and alterations done. | |
17 | Proper pointing, packing and finishing done. |