This checklist provides list of things to do before, during and after plastering work so that best quality plaster work can be achieved without delays and wastage.
Sr | Check Item | Done |
1 | Before : Check Drg./Number/Date and Revision for all other service like electrical, plumbing etc. | |
2 | Before : Safety access platform. | |
3 | Before : Check for hacking/Button marking/ Mortar thickness. | |
4 | Before : Provision of chicken mesh for conduits, column brick work joints and other. | |
5 | Before : Preparation of Surface – Remove moss / efflorescence and Dampen Surface | |
6 | Before : Material stacked – Cement, Sand at various locations. | |
7 | Before : Prewetting of surface. | |
8 | Before : Quality of Sand – Screening Silt. | |
9 | Before : Check the Beam/ BW Joints packing with Nito Bond AR | |
10 | Before : Check for Door Frame Projections. | |
11 | During : Platform for morter mixing on tray. | |
12 | During : Check for thickness/level and line and right angle. | |
13 | During : Proportion of mix. | |
14 | During : Addition of water proofing compound. | |
15 | During : Proper roughing of first coat. | |
16 | During : Check for collection of mortar spills. | |
17 | During : Cleaning of dead mortar. | |
18 | During : Check for waviness. | |
19 | During : Check for grooves / drip moulds. | |
20 | During : Application of cement slurry on concrete surface / Space for tile area, cutting for skirting area. | |
21 | During : Check for loft thickness and top surface in dead level W/Robe size. | |
22 | After : Curing water distribution for various locations. | |
23 | After : Check for hollowness. | |
24 | After : Check for cracks. | |
25 | After : Check for plastering date for curing. |